For upstream & midstream operators

They came back an A. Then the crew changed.

Company-level checks miss whether the workers actually on site are ready. Hear how operators close that gap on The Risk Matrix, then see where your own program stands.


Hosted by Dr. L.F. Martin, a 32-year EHS veteran, and James Junkin, winner of ASSP’s 2024 Training and Communications category award with more than 40,000 safety professionals trained.


From the show · Episode 130

“I had CSPs with master’s degrees who couldn’t get through the gate because we didn’t have OSHA 30 cards.”

James Junkin, co-host, on the contractor credentialing gap source

What one utility company found (Episode 130)

Up to 40%

of workers arriving with an unknown training status

170

untrained workers identified before they started work

96%

of Veriforce assessments find a training gap


The 40% and 170 slipped through one utility company’s manual, paperwork-based screening before WorkerPass caught them (Episode 130). The 96% is Veriforce’s own deep-dive assessment data, across industries (Episode 142). A clean prequal is not a verified worker.

Start here · 5 episodes

The episodes every oil & gas operator should hear.

Pulled from the live Risk Matrix library: five that speak straight to contractor risk in oil & gas right now.

YOUR MOVE

Book your 30-minute program review.

We’ll walk your upstream or midstream program against what audit-ready looks like. Real people who do the follow-up, not just a portal. No demo, no pressure.

Prefer to listen first? Subscribe to The Risk Matrix & the Veriforce newsletter.

Trusted across oil & gas

From single-basin independents to the largest producers, oil and gas operators run their contractor programs on Veriforce.

0
years of contractor management
0
hiring clients
0
contractors in the network
0
countries served

Book your review

 

Why operators switch

Built BY oil and gas, FOR oil and gas.

Veriforce keeps your contractors qualified, compliant, and safe on site, backed by real safety experts, not just software.

140,000+

contractors in the network

96.4%

contractor satisfaction

65

NPS

Up to 48%

lower fees than ISN for your smallest contractors

One place for the whole contractor program.

Contractor management, worker credentialing, training, and worksite access, all in one system, backed by a real support team.

Real people, not just a portal.

Most contractor management is software and a support queue. Veriforce pairs the software with safety professionals you can reach by name.

Priced to risk, not a flat fee.

Contractor costs scale with actual risk level. No one-size-fits-all subscription.

From the podcast to your program

Close the gap with what Veriforce already does.

Most programs stop at collecting documents. Veriforce verifies in the field, where the risk actually lives. The show’s themes map to live solutions built for energy operators.

Training & Compliance Verification

Every worker’s training and certifications verified against the task at hand, not just a company-level checkbox, with documentation ready for the audit.

See training & compliance →

Worksite Management

The right workers, doing the right work, the right way. Verified at the gate, not assumed from a file, because an A on paper isn’t always an A on the job.

See worksite management →

Regulatory Services

PHMSA and DOT compliance handled by Veriforce experts, so your team gets its hours back.

See regulatory services →

Built to bring your workers home safe.

For procurement teams

Smarter tools, same bottleneck.

Oil & gas procurement teams are absorbing tariff pressure, inflation, and capital project delays, while contractor verification still runs nearly two business days per assessment. New Veriforce/Informa TechTarget research with 150+ procurement leaders shows where the tools help, and where they hold teams back.

44%

cite a time-consuming contractor verification process

The single biggest complaint in contractor compliance and lifecycle management, ahead of automation gaps or siloed workflows.

4.7

tools used, on average, to run one contractor assessment

Spreadsheets, databases, and point solutions, stitched together by hand.

54%

point to tariffs or economic uncertainty as a top driver of project delays

Inflation and cost escalation follow close behind, cited by 49%.